Victoria | Erskine Lane

Civil Infrastructure Completion | Walls, Curbs & Final Finishes

Despard Contracting recently wrapped up the second and final phase of Civil infrastructure work at Erskine Lane, completing the transformation of this dynamic residential development. Following earlier groundwork and utility installations, this stage focused on delivering the lasting, visible elements that bring the site together — combining engineered stability with polished presentation.

The project scope encompassed the installation of engineered retaining walls, concrete curbs, and hardscape finishes designed for both functionality and curb appeal. These structural and aesthetic improvements mark the culmination of months of precise preparation and careful execution, aligning with Despard Contracting’s commitment to full-spectrum site development.

Engineered Retaining Walls

The highlight of this phase was the installation of Allan block retaining walls, engineered to reinforce the site’s elevations and ensure long-term durability. Beyond their structural role, these retaining walls were designed to harmonize with the natural terrain and surrounding architecture, contributing to a finished look that complements the property’s visual identity. Each wall was constructed with precision, integrating modern design standards and drainage considerations to optimize both appearance and performance.

Hardscape and Concrete Finishes

In tandem with the wall construction, Despard Contracting carried out extensive hardscape and concrete work. This included the forming and pouring of curbs and sidewalks, as well as fine-tuned asphalt installation for clean, even surfaces and reliable vehicle access. Functional grading was performed to ensure proper surface flow and drainage, protecting the longevity of both the pavement and surrounding landscaping. These details reflect the company’s reputation for craftsmanship that blends technical accuracy with visual refinement.

Coordinated Landscaping and Final Touches

Once the core infrastructure was complete, Despard’s team turned attention to landscaping and surface detailing — the stage that transforms a work site into a livable, finished environment. Greenery, topsoil treatments, and clean edges were added to tie the site together, merging the engineered base with soft natural finishes. These coordinated efforts enhance the development’s overall appeal, ensuring a cohesive aesthetic that flows from the property boundaries to each curb and walkway.

The Culmination of Full-Scope Work

This phase represents the completion of Despard Contracting’s work at Erskine Lane — a project that began with deep excavation, drainage planning, and underground utilities before evolving into a refined, fully realized space. The result stands as a testament to the company’s comprehensive site service expertise, where every phase, from heavy civil work to final landscaping, is executed with consistency and quality.

At Erskine Lane, Despard Contracting demonstrated once again that infrastructure excellence goes beyond what’s below ground — it’s about creating a lasting foundation for function, beauty, and community. The project now stands as a complete, durable, and visually cohesive site, ready for long-term use and continued development in the surrounding area.

Excavation

Utilities

Retaining Walls

Concrete

Asphalt

Drainage

Coordination

Infrastructure

Project Management