Victoria | Wallace Drive
Municipal Infrastructure Improvement
Infrastructure and Water Main Installation
The Wallace Drive Municipality project showcased Despard Contracting’s expertise in essential civil infrastructure work. The scope included the installation of a new water main and service connections, requiring careful excavation and precise alignment to integrate with existing municipal systems. Our team ensured all trenching, bedding, and pipe installation met engineering standards for safety and long-term reliability.
Throughout the process, Despard maintained strict safety measures and traffic management protocols to minimize disruption to residents and local traffic. The project was completed efficiently, with all underground utilities tested and inspected prior to backfilling and surface restoration.
Sidewalk, Curb, and Asphalt Replacement
Following the water main installation, Despard Contracting carried out the full removal and replacement of sidewalks, curbs, and asphalt surfaces. Our crews ensured proper grading, compaction, and concrete forming to deliver a durable, accessible, and visually cohesive finish across all pedestrian and roadway areas.
The asphalt replacement process included milling, base preparation, and paving, restoring the roadway to a clean and professional standard. These improvements not only enhanced the structural integrity of the corridor but also improved safety and accessibility for the public.
Landscaping and Site Restoration
Once the civil work was complete, Despard’s team restored surrounding landscapes to ensure the site blended seamlessly with the existing environment. This included soil replacement, turf reinstatement, and cleanup of all disturbed areas. Attention to detail in final grading and finishing helped achieve a polished, fully restored municipal space ready for public use.
Our comprehensive approach—from excavation to final landscaping—ensured the Wallace Drive project was completed safely, efficiently, and to the satisfaction of both municipal inspectors and community members.
Efficiency, Safety, and Quality
Despard Contracting’s coordinated work on Wallace Drive reflects the company’s ability to manage complex, multi-scope municipal projects. Every stage—from utility installation to paving and landscaping—was executed with precision and accountability. Through efficient scheduling, clear communication, and adherence to high safety and environmental standards, the project was delivered on time and within scope.
By combining technical skill with community awareness, Despard Contracting continues to support municipal partners across Vancouver Island with reliable infrastructure solutions that improve public spaces for years to come.








